10.         Conclusions

 

10.1.1   24-hour TSP impact monitoring and construction noise monitoring were carried out in the reporting month, no Action / Limit Level exceedance was recorded during the period.

 

10.1.2   No complaint of air quality was received. Therefore, no impact 1-hour TSP monitoring was conducted in the reporting month.

 

10.1.3   Five environmental site inspections were carried out in December 2016. Recommendations on mitigation measures on air quality, water quality, noise, waste management and landscape and visual impact were given to the Contractor for remediating the deficiencies identified during the site inspections.

 

10.1.4   Five weekly Landscape and Visual Site audits were carried out on 1, 8, 14, 21 and 29 December 2016 and three of them, 1, 8 and 21 December 2016 were carried out by a Registered Landscape Architect in the reporting month. The weekly Landscape and Visual Impact reports were counter-signed by IEC as according to the requirement of EM&A Manual (AEIAR-130/2009).

 

10.1.5   Referring to the Contractor’s information, no environmental complaint, notification of summons and successful prosecution was received in the reporting month.

 

10.2       Comment and Recommendations

 

10.2.1   The recommended environmental mitigation measures, as proposed in the EIA reports and EM&A Manuals shall be effectively implemented to minimize the potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental impacts generated from the construction activities and ensure the proper implementation of mitigation measures.

 

10.2.2   According to the environmental audit performed in the reporting month, the following recommendations were made:

 

Air Quality Impact

l   Open stockpiles shall be covered by unobtrusive sheeting to prevent dust emission.

 

Construction Noise Impact

l   The door of air compressor shall be closed in order to reduce noise impact.

 

Water Quality Impact

l   No specific observation was identified in the reporting month.

 

Chemical and Waste Management

l   Sufficient waste disposal points and regular collection for disposal shall be provided.

l   Chemical oil shall be stored properly. Drip tray shall be provided.

 

Landscape and Visual Impact

l   Open stockpiles shall be covered by unobtrusive sheeting to prevent dust and dirt spreading to adjacent landscape areas and vegetation, and to create a neat and tidy visual appearance.

 

 

General Condition

l   Stagnant water was found in the storage area of construction materials. Stagnant water shall be removed.

 

Permit / Licenses

l   No specific observation was identified in the reporting month.