6.1.1
Site inspections were carried out weekly to
monitor the implementation of proper environmental pollution control and
mitigation measures for the Project. A summary of the mitigation measures implementation
schedule is provided in Appendix
J.
6.1.2
In the reporting month, five site inspections
were carried out on 1,
8, 14, 21 and 29 December 2016. Two of them, held on 14 and 21 December 2016 were the
joint inspections with the IEC, ER, the Contractor and the ET.
6.1.3
No outstanding issues were reported during
the reporting month. Details of observations recorded during the site
inspections are summarized in Appendix
M.
6.1.4
All the follow-up actions requested by
Contractor’s ET and IEC during the site inspections were undertaken as reported
by the Contractor and confirmed in the following weekly site inspection
conducted during the reporting month.