Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

14 December 2016

Open stockpile shall be covered with impermeable sheeting to prevent dust emission.  (Portion I)

The item was rectified by the Contractor and inspected on 21 December 2016.

29 December 2016

Open stockpile shall be covered with impermeable sheeting to prevent dust emission. (Portion I)

The item was rectified by the Contractor and inspected on 5 January 2017.

Noise

1 December 2016

The door of air compressor shall be closed in order to reduce noise impact. (Zone 4)

The item was rectified by the Contractor and inspected on 8 December 2016.

Water Quality

NA

Chemical and Waste Management

21 December 2016

Sufficient waste disposal points and regular collection for disposal shall be provided. Larger skip shall be provided. General refuse shall be collected regularly (Zone 2).

The item was rectified by the Contractor and inspected on 29 December 2016.

21 December 2016

Chemical oil shall be stored properly. Drip tray shall be provided (Zone 3).

The item was rectified by the Contractor and inspected on 29 December 2016.

Land Contamination

NA

Landscape and Visual Impact

 14 December 2016

Open stockpiles shall be covered by unobtrusive sheeting to prevent dust and dirt spreading to adjacent landscape areas and vegetation, and to create a neat and tidy visual appearance. (Portion I and Zone 1)

The item was rectified by the Contractor and inspected on 21 December 2016.

29 December 2016

Open stockpiles shall be covered by unobtrusive sheeting to prevent dust and dirt spreading to adjacent landscape areas and vegetation, and to create a neat and tidy visual appearance. (Portion I)

The item was rectified by the Contractor and inspected on 5 January 2017.

General Condition

8 December 2016

Stagnant water was found in the platform in Zone 1. Stagnant water shall be removed. (Zone 1)

The item was rectified by the Contractor and inspected on 14 December 2016.