Parameters |
Date |
Observations and Recommendations |
Follow-up |
Air Quality |
14 December 2016 |
Open stockpile shall be covered with
impermeable sheeting to prevent dust emission. (Portion I) |
The item was rectified by the
Contractor and inspected on 21 December 2016. |
29 December 2016 |
Open stockpile shall be covered with
impermeable sheeting to prevent dust emission. (Portion I) |
The item was rectified by the Contractor
and inspected on 5 January 2017. |
|
Noise |
1 December 2016 |
The door of air compressor shall be
closed in order to reduce noise impact. (Zone 4) |
The item was rectified by the
Contractor and inspected on 8 December 2016. |
Water Quality |
NA |
||
Chemical and Waste Management |
21 December
2016 |
Sufficient waste disposal points and
regular collection for disposal shall be provided. Larger skip shall be
provided. General refuse shall be collected regularly (Zone 2). |
The item was rectified by the
Contractor and inspected on 29 December 2016. |
21 December
2016 |
Chemical oil shall be
stored properly. Drip tray shall be provided (Zone 3). |
The item was rectified by
the Contractor and inspected on 29 December 2016. |
|
Land Contamination |
NA |
||
Landscape and Visual Impact |
14 December 2016 |
Open
stockpiles shall be covered by unobtrusive sheeting to prevent dust and dirt
spreading to adjacent landscape areas and vegetation, and to create a neat
and tidy visual appearance. (Portion I and Zone 1) |
The item was rectified by the
Contractor and inspected on 21 December 2016. |
29 December
2016 |
Open
stockpiles shall be covered by unobtrusive sheeting to prevent dust and dirt
spreading to adjacent landscape areas and vegetation, and to create a neat
and tidy visual appearance. (Portion I) |
The item was rectified by the
Contractor and inspected on 5 January 2017. |
|
General Condition |
8 December 2016 |
Stagnant water was found in the platform
in Zone 1. Stagnant water shall be removed. (Zone 1) |
The item was rectified by the
Contractor and inspected on 14 December 2016. |