Summary
of Site Audit in the Reporting Month
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air Quality |
30 March 2017 |
Open stockpile shall be covered with impermeable sheeting
to prevent dust emission. (Zone 3) |
The item was rectified by the Contractor and inspected on
6 April 2017. |
2 March 2017 |
Main haul road shall be kept clear of muddy or dusty
materials or sprayed with water regularly. (Zone 1) |
The item was rectified by the Contractor and inspected on
9 March 2017. |
|
Noise |
30 March 2017 |
The door of the air compressor shall be closed to reduce
noise emission. (Zone 3) |
The item was rectified by the
Contractor and inspected on 6 April 2017. |
Water Quality |
NA |
||
Chemical and Waste Management |
23 March 2017 |
The skip containing general
refuse should be stored properly. (Zone 1) |
The item was rectified by the Contractor and inspected on
30 March 2017. |
30 March 2017 |
The empty fuel bottle shall be
handled properly (Zone 3). |
The item was rectified by the
Contractor and inspected on 6 April 2017. |
|
Land Contamination |
NA |
||
Landscape and Visual Impact |
30 March 2017 |
Open stockpiles shall be
covered by unobtrusive sheeting to prevent dust and dirt spreading to
adjacent landscape areas and vegetation, and to create a neat and tidy visual
appearance. (Zone 3) |
The item was rectified by the Contractor and inspected on
6 April 2017. |
General Condition |
2 March 2017 |
Proper wheel washing facilities in every vehicle exit
point shall be provided or otherwise to ensure no vehicle would exit. (Zone
3) |
The item was rectified by the Contractor and inspected on
9 March 2017. |
9 March 2017 |
Contractor was reminded to prevent
flooding occurred at the sink. (Zone 4) |
The item was rectified by the Contractor and inspected on
15 March 2017. |