8.1.1
The
Contractor has implemented environmental mitigation measures and requirements
as stated in the EIA Reports, the EP and the EM&A Manuals. The
implementation status of the mitigation measures during the reporting month is summarized
in Appendix
J. Status of required submission under the EP during the reporting
period is summarized in Table 8.1.