Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

1 June  2017

Regular watering to the site working area shall be provided to suppress dust emission. (Zone 1)

The item was rectified by the Contractor and inspected on 8 June 2017.

15 June 2017

Open stockpiles of excavated material shall be covered properly with impervious sheeting to avoid dust emission. (Zone 1)

The item was rectified by the Contractor and inspected on 23 June 2017

Noise

NA

Water Quality

1 June 2017

The mud at mud tank shall be removed to prevent overflow of storm water at the mud tank. (Zone 1)

The item was rectified by the Contractor and inspected on 8 June 2017.

Chemical and Waste Management

8 June 2017

Chemical containers shall be stored on drip tray. (Zone 1)

The item was rectified by the Contractor and inspected on 15 June 2017.

8 June 2017

General refuse shall be stored properly and removed regularly. (Zone  2)

The item was rectified by the Contractor and inspected on 15 June 2017.

15 June 2017

General refuse, spent chemical containers and used bags of cement shall be stored properly. (Zone 2)

The item was rectified by the Contractor and inspected on 23 June 2017.

Land Contamination

NA


 

Landscape and Visual Impact

8 June 2017

Debris and concrete shall be properly covered. (Zone 4)

The item was rectified by the Contractor and inspected on 15 June 2017.

 15 June 2017

Excavated materials shall be properly covered by impervious sheeting. (Zone 4)

The item was rectified by the Contractor and inspected on 23 June 2017.

General Condition

23 June 2017

Stagnant water shall be removed. (Portion I and Portion O)

The item was rectified by the Contractor and inspected on 29 June 2017.