8.            IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES

 

8.1         Implementation Status

 

The Contractor has implemented environmental mitigation measures and requirements as stated in the EIA Reports, the EP and the EM&A Manuals. The implementation status of the mitigation measures during the reporting month is summarized in Appendix J. Status of required submission under the EP during the reporting period is summarized in Table 8.1.