Summary
of Site Audit in the Reporting Month
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air Quality |
24 August
2017 |
Contractor was reminded to cover stockpiles with impervious sheetings properly. (Portion I) |
The item was rectified by the Contractor and inspected on
31 August 2017. |
31 August 2017 |
Open stockpiling of C&D materials shall be covered properly.
Impermeable sheeting shall be provided. (Zone 1) |
The item was rectified by the Contractor and inspected on
7 September 2017. |
|
Noise |
31 August 2017 |
Appropriate noise absorption material shall be provided to the
operating breaker. (Zone 4) |
The item was rectified by the Contractor and inspected on
7 September 2017. |
Water Quality |
3 August 2017 |
Waste water treatment system shall be improved to prevent the
accumulation of muddy water and water seepage at the low lying area at
Portion I. Contractor was recommended to separate the discharge point and the
desilting pond, seal the concrete blocks, and provide additional pumps.
(Portion I) |
The item was rectified by the Contractor and inspected on
10 August 2017. |
Chemical and Waste Management |
10 August 2017 |
Cement residue was found in the public haul road. Impermeable sheeting
shall be provided when loading the cement. (Zone 2) |
The item was rectified by the Contractor and inspected on
17 August 2017. |
Land Contamination |
NA |
||
Landscape and Visual Impact |
3 August 2017 |
Decorative hoardings shall be provided along Shing Cheong Road. |
The item was rectified by the Contractor and inspected on
17 August 2017. |
24 August
2017 |
Contractor was reminded to cover stockpiles with impervious sheetings properly. (Portion I) |
The item was rectified by the Contractor and inspected on
31 August 2017. |
|
31 August 2017 |
Open stockpiling of C&D materials shall be covered properly.
Impermeable sheeting shall be provided. (Zone 1) |
The item was rectified by the Contractor and inspected on
7 September 2017. |
|
General Condition |
17 August 2017 |
Contractor was reminded that the low-lying area at Portion I shall be
kept clear of silt, dusty or muddy materials. (Portion I) |
The item was rectified by the Contractor and inspected on
24 August 2017. |