Summary
of Site Audit in the Reporting Month
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
|||
Air Quality |
11 January 2018 |
Broken concrete should be removed promptly (Zone 4). |
The item was rectified by the Contractor and inspected on
17 January 2018. |
|||
17 January 2018 |
The load of dusty materials carried by vehicle leaving the site should
be covered by impervious sheeting. |
The item was rectified by the Contractor and inspected on
25 January 2018. |
||||
Noise |
NA |
|||||
Water Quality |
11 January 2018 |
Construction runoff was
discharged into drainage without treatment (Zone 1). Sand bag should be
provided to prevent direct discharge of construction runoff. |
The item was rectified by the Contractor and inspected on
17 January 2018. |
|||
Chemical and Waste Management |
NA |
|||||
Land Contamination |
NA |
|||||
Landscape and Visual Impact |
11 January 2018 |
Broken concrete should be removed promptly (Zone 4). |
The item was rectified by the Contractor and inspected on
17 January 2018. |
|||
General Condition |
NA |
|||||