Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

11 January 2018

Broken concrete should be removed promptly (Zone 4).

The item was rectified by the Contractor and inspected on 17 January 2018.

17 January 2018

 

The load of dusty materials carried by vehicle leaving the site should be covered by impervious sheeting.

 

The item was rectified by the Contractor and inspected on 25 January 2018.

Noise

NA

Water Quality

 

11 January 2018

 

Construction runoff was discharged into drainage without treatment (Zone 1). Sand bag should be provided to prevent direct discharge of construction runoff.

 

The item was rectified by the Contractor and inspected on 17 January 2018.

Chemical and Waste Management

 

NA

 

Land Contamination

NA

Landscape and Visual Impact

11 January 2018

Broken concrete should be removed promptly (Zone 4).

The item was rectified by the Contractor and inspected on 17 January 2018.

General Condition

 

NA