Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

 

4 April 2018

 

Contractor was reminded to provide sufficient watering on stockpile to suppress dust (Radar Tower).

The item was rectified by the Contractor and inspected on 12 April 2018.

18 April 2018

 

Contractor was reminded to replace the NRMM label of mobile crane shall be replaced with proper label color (Zone 3).

 

The item was rectified by the Contractor and inspected on 26 April 2018.

26 April 2018

 

Contractor was reminded that NRMM label on mobile crane shall be replaced with proper label color (Zone 2).

 

The item was rectified by the Contractor and inspected on 3 May 2018.

Noise

NA

Water Quality

12 April 2018

 

Slurry was observed accumulating in the U-Channel (Zone 2). Contractor should clean the U-Channel regularly to prevent accumulation of slurry.

 

The item was rectified by the Contractor and inspected on 18 April 2018.

18 April 2018

 

Contractor was reminded to clean the sediments inside the sedimentation tank regularly (Zone 1).

The item was rectified by the Contractor and inspected on 26 April 2018.

Chemical and Waste Management

NA

Land Contamination

NA

Landscape and Visual Impact

NA

General Condition

 

NA