Summary
of Site Audit in the Reporting Month
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
||
Air Quality |
4 April 2018 |
Contractor was reminded to provide sufficient watering on stockpile to
suppress dust (Radar Tower). |
The item was rectified by the Contractor and inspected on
12 April 2018. |
||
18 April 2018 |
Contractor was reminded to replace the NRMM label of
mobile crane shall be replaced with proper label color (Zone 3). |
The item was rectified by the
Contractor and inspected on 26 April 2018. |
|||
26 April 2018 |
Contractor was reminded that NRMM label on mobile crane
shall be replaced with proper label color (Zone 2). |
The item was rectified by the Contractor and inspected on
3 May 2018. |
|||
Noise |
NA |
||||
Water Quality |
12 April 2018 |
Slurry was observed accumulating in the U-Channel (Zone
2). Contractor should clean the U-Channel regularly to prevent accumulation
of slurry. |
The item was rectified by the Contractor and inspected on
18 April 2018. |
||
18 April 2018 |
Contractor was reminded to clean the sediments inside the
sedimentation tank regularly (Zone 1). |
The item was rectified by the Contractor and inspected on
26 April 2018. |
|||
Chemical and Waste Management |
NA |
||||
Land Contamination |
NA |
||||
Landscape and Visual Impact |
NA |
||||
General Condition |
NA |
||||