Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

 

3 May 2018

 

Dark smoke was emitted from machine plant (Zone 2). Contractor should maintain plant/equipment regularly to prevent dark smoke emission.

 

The item was rectified by the Contractor and inspected on 10 May 2018.

10 May 2018

 

Contractor was reminded that stockpile should be covered properly with impermeable sheeting (Zone 1)

 

The item was rectified by the Contractor and inspected on 16 May 2018.

31 May 2018

 

Contractor was reminded to remove the stockpile to avoid dust (Zone 2)

 

The item was rectified by the Contractor and inspected on 7 June 2018.

Noise

NA

Water Quality

3 May 2018

 

Contractor was reminded that stagnant water shall be removed (Zone 3).

 

The item was rectified by the Contractor and inspected on 10 May 2018.

16 May 2018

 

Contractor was reminded to provide concrete bunding at site exits to prevent leakage of muddy water to public areas (Zone 3 and 4).

 

The item was rectified by the Contractor and inspected on 24 May 2018. (Zone 3)

24 May 2018

 

Contractor was reminded to provide concrete bunding at site exits to prevent leakage of muddy water to public areas (Zone 4).

 

The item was rectified by the Contractor and inspected on 31 May 2018.

31 May 2018

 

The mud in wheel washing facility should be removed (Portion I).

 

The item was rectified by the Contractor and inspected on 7 June 2018.

Chemical and Waste Management

16 May 2018

 

Chemical containers shall be placed on drip tray (Zone 2 and 3). Drip tray shall be provided.

 

The item was rectified by the Contractor and inspected on 24 May 2018.

Land Contamination

NA

Landscape and Visual Impact

10 May 2018

 

Contractor was reminded that stockpile should be covered properly with impermeable sheeting (Zone 1)

The item was rectified by the Contractor and inspected on 16 May 2018.

General Condition

 

NA