10.1.1 24-hour TSP impact
monitoring and construction noise monitoring were carried out in the reporting
month, no Action / Limit Level exceedance was recorded during the period.
10.1.2 No complaint of air quality was received. Therefore, no impact 1-hour TSP
monitoring was conducted in the reporting month.
10.1.3 Four environmental site
inspections were carried out in the reporting month. Recommendations on
mitigation measures on air quality, water quality, waste management and
landscape and visual impact were given to the Contractor for remediating the
deficiencies identified during the site inspections.
10.1.4 Four weekly Landscape and Visual Site audits were carried out on 7, 14, 21 and 28 June
2018 and two of them, 7 and
21 June 2018 were carried out by a Registered Landscape Architect in the
reporting month. The weekly Landscape and Visual Impact reports were
counter-signed by IEC as according to the requirement of EM&A Manual
(AEIAR-130/2009).
10.1.5 Referring to the Contractor’s information, no environmental complaint, notification
of summons and successful prosecution was received in the reporting month.
10.2
Comment and Recommendations
10.2.1 The recommended environmental mitigation measures, as proposed in the EIA
reports and EM&A Manuals shall be effectively implemented to minimize the
potential environmental impacts from the Project. The EM&A programme would effectively
monitor the environmental impacts generated from the construction activities
and ensure the proper implementation of mitigation measures.
10.2.2 According to the environmental audit performed in the reporting month,
the following recommendations were made:
Air Quality
Impact
l Unused construction materials and
construction waste should be removed or covered properly.
Construction
Noise Impact
l No
specific observation was identified in the reporting month.
Water Quality Impact
l
The surrounding of discharge point should be kept clear of silt, dusty
and muddy materials.
Chemical and Waste Management
l Unused construction materials and
construction waste should be removed or covered properly.
Land Contamination
l No specific observation was identified in the
reporting month.
Landscape
and Visual Impact
l Unused construction materials and
construction waste should be removed or covered properly.
General Condition
l No
specific observation was identified in the reporting month.
Permit /
Licenses
l No
specific observation was identified in the reporting month.