8.1.1
The
Contractor has implemented environmental mitigation measures and requirements
as stated in the EIA Reports, the EP and the EM&A Manuals. The
implementation status of the mitigation measures during the reporting month is
summarized in Appendix J. Status of required
submission under the EP during the reporting period is summarized in Table 8.1.
Table
8.1 Status
of Required Submission under Environmental Permit
EP
Condition |
Submission |
Submission
Date |
EP-337/2009 |
||
Condition 2.3 |
Management Organization of Main Construction Companies |
18/12/2015 |
Condition 2.4 |
Design Drawing of the Project |
18/12/2015 |
Condition 2.11 |
Landscape Mitigation Plan(s) |
18/12/2015 |
Condition 3.3 |
Monthly
EM&A Report (May 2018) |
13/6/2018 |
EP-339/2009/A |
||
Condition 2.4 |
Management Organization of Main Construction Companies |
18/12/2015 |
Condition 2.5 |
Design Drawing of the Project |
18/12/2015 |
Condition 3.3 |
Monthly
EM&A Report (May 2018) |
13/6/2018 |
EP-451/2013 |
||
Condition 2.3 |
Management Organization of Main Construction Companies |
18/12/2015 |
Condition 2.4 |
Design Drawing of the Project |
18/12/2015 |
Condition 2.5 |
Landscape Mitigation Plan(s) |
18/12/2015 |
Condition 2.10 |
Supplementary Contamination Assessment Report |
18/12/2015 |
Condition 3.3 |
Baseline Monitoring Report |
12/02/2016 |
Condition 3.4 |
Monthly
EM&A Report (May 2018) |
13/6/2018 |