Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

 

21 June 2018

Unused construction materials and construction wastes should be removed or covered properly (Zone 1 and Zone 2).

The item was rectified by the Contractor and inspected on 28 June 2018.

Noise

NA

Water Quality

14 June 2018

Contractor was reminded that the surrounding of discharge point be kept clear of silt, dusty or muddy materials (Portion I).

The item was rectified by the Contractor and inspected on 21 June 2018.

Chemical and Waste Management

21 June 2018

Unused construction materials and construction wastes should be removed or covered properly (Zone 1 and Zone 2).

The item was rectified by the Contractor and inspected on 28 June 2018.

Land Contamination

NA

Landscape and Visual Impact

21 June 2018

Unused construction materials and construction wastes should be removed or covered properly (Zone 1 and Zone 2).

The item was rectified by the Contractor and inspected on 28 June 2018.

General Condition

 

NA