The
Civil Engineering and Development Department HKSAR has appointed Fugro
Technical Services Limited (FTS) to undertake the Environmental Team services
for the Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 September 2018 and 30 September 2018. As informed by
the Contractor, major activities in the reporting month were:
Excavation
and laying of drainage pipe and manhole;
Construction
of tunnel box structure;
Excavation
and ELS construction.
Breaches of the Action and Limit Levels
iii. No Action / Limit Level exceedance was recorded
for 24-hr TSP and construction noise at KTD1a, KTD2b and KER1b in the reporting
month.
Complaint,
Notification of Summons and Successful Prosecution
iv. No environmental complaint, notification of
summons and successful prosecution were received in the reporting month.
Reporting Changes
v. There was no reporting change in the
reporting month.
Future Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential
environmental impacts arising from the above construction activities are mainly
associated with construction dust, construction noise, water quality, waste
management and landscape and visual impact.