8.            IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES

 

8.1         Implementation Status

 

8.1.1     The Contractor has implemented environmental mitigation measures and requirements as stated in the EIA Reports, the EP and the EM&A Manuals. The implementation status of the mitigation measures during the reporting month is summarized in Appendix J. Status of required submission under the EP during the reporting period is summarized in Table 8.1.

 

Table 8.1         Status of Required Submission under Environmental Permit

EP Condition

Submission

Submission Date

EP-337/2009

Condition 2.3

Management Organization of Main Construction Companies

18/12/2015

Condition 2.4

Design Drawing of the Project

18/12/2015

Condition 2.11

Landscape Mitigation Plan(s)

18/12/2015

Condition 3.3

Monthly EM&A Report (September 2018)

12/10/2018

EP-339/2009/A

Condition 2.4

Management Organization of Main Construction Companies

18/12/2015

Condition 2.5

Design Drawing of the Project

18/12/2015

Condition 3.3

Monthly EM&A Report (September 2018)

12/10/2018

EP-451/2013

Condition 2.3

Management Organization of Main Construction Companies

18/12/2015

Condition 2.4

Design Drawing of the Project

18/12/2015

Condition 2.5

Landscape Mitigation Plan(s)

18/12/2015

Condition 2.10

Supplementary Contamination Assessment Report

18/12/2015

Condition 3.3

Baseline Monitoring Report

12/02/2016

Condition 3.4

Monthly EM&A Report (September 2018)

12/10/2018