Summary
of Site Audit in the Reporting Month
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
|
Air Quality |
24 October 2018 |
Reminder: Backfilling material in Zone 1 should be properly covered. |
NA |
|
Noise |
NA |
|||
Water Quality |
NA |
|||
Chemical and Waste Management |
3 October 2018 |
Observation: Chemical containers were not placed on drip tray (Zone 3). Contractor
should provide drip tray to store chemical containers properly. |
The item was rectified by the Contractor and inspected on
10 October 2018. |
|
Land Contamination |
NA |
|||
Landscape and Visual Impact |
24 October 2018 |
Reminder: Backfilling material in Zone 1 should be properly covered. |
NA |
|
General Condition |
NA |
|||