10.1.1 24-hour TSP impact
monitoring and construction noise monitoring were carried out in the reporting
month, no Action / Limit Level exceedance was recorded during the period.
10.1.2 No complaint of air quality was received. Therefore, no impact 1-hour TSP
monitoring was conducted in the reporting month.
10.1.3 Four environmental site
inspections were carried out in the reporting month. Recommendations on
mitigation measures on air quality, chemical and waste management and landscape
and visual impact were given to the Contractor for remediating the deficiencies
identified during the site inspections.
10.1.4 Four weekly Landscape and Visual Site audits were carried out on 7, 14, 21 and 28 November
2018 and two of them, 7 and
21 November 2018 were carried out by a Registered Landscape Architect in the
reporting month. The weekly Landscape and Visual Impact reports were
counter-signed by IEC as according to the requirement of EM&A Manual
(AEIAR-130/2009).
10.1.5 Referring to the Contractor’s information, no environmental complaint, notification
of summons and successful prosecution was received in the reporting month.
10.2
Comment and Recommendations
10.2.1 The recommended environmental mitigation measures, as proposed in the EIA
reports and EM&A Manuals shall be effectively implemented to minimize the
potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental
impacts generated from the construction activities and ensure the proper
implementation of mitigation measures.
10.2.2 According to the environmental audit performed in the reporting month,
the following recommendations were made:
Air Quality Impact
l Dust
was observed on the ground.
Construction Noise Impact
l Contractor
was reminded to use acoustic fabric during breaking.
Water
Quality Impact
l Contractor
was reminded to clear the sediments in the sedimentation tank regularly.
l Broken
water pipe shall be repaired as soon as possible.
Chemical and Waste Management
l No specific observation was identified in the
reporting month.
Land
Contamination
l No specific observation was identified in the
reporting month.
Landscape and Visual Impact
l No
specific observation was identified in the reporting month.
General Condition
l No
specific observation was identified in the reporting month.
Permit / Licenses
l No
specific observation was identified in the reporting month.