Installation of sheet
pile for drainage works;
Excavation and laying
of drainage pipe and manhole;
Construction of road
base and road pavement;
Construction of SUS
structure;
Construction of socketed
H-Pile;
Excavation and ELS
construction; and
Construction of
District Cooling System.
9.2.1
Potential
environmental impacts arising from the above construction activities are mainly
associated with construction dust, construction noise, water quality, waste
management and landscape and visual impact.
9.3.1
The
tentative schedules for environmental monitoring in the coming three months are
provided in Appendix E.