10.1.1 24-hour TSP impact
monitoring and construction noise monitoring were carried out in the reporting
month, no Action / Limit Level exceedance was recorded during the period.
10.1.2 No complaint of air quality was received. Therefore, no impact 1-hour TSP
monitoring was conducted in the reporting month.
10.1.3 Five environmental site
inspections were carried out in the reporting month. Recommendations on
mitigation measures on air quality and construction noise were given to the
Contractor for remediating the deficiencies identified during the site
inspections.
10.1.4 Five weekly Landscape and Visual Site audits were carried out on 2, 9, 16, 23 and 30 January 2019 and three
of them 2, 16 and 30 January 2019 were
carried out by a Registered Landscape Architect in the reporting month. The
weekly Landscape and Visual Impact reports were counter-signed by IEC as
according to the requirement of EM&A Manual (AEIAR-130/2009).
10.1.5 Referring to the Contractor’s information, no environmental complaint, notification
of summons and successful prosecution was received in the reporting month.
10.2
Comment and Recommendations
10.2.1 The recommended environmental mitigation measures, as proposed in the EIA
reports and EM&A Manuals shall be effectively implemented to minimize the
potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental
impacts generated from the construction activities and ensure the proper
implementation of mitigation measures.
10.2.2 According to the environmental audit performed in the reporting month,
the following recommendations were made:
Air Quality Impact
l Muddy
trail should be sprayed with water and cleaned up regularly.
l Vehicle
washing facilities should be provided at exit point.
Construction Noise Impact
l Acoustic
fabric should be provided during breaking.
Water
Quality Impact
l No
specific observation was identified in the reporting month.
Chemical and Waste Management
l No
specific observation was identified in the reporting month.
Land
Contamination
l No specific observation was identified in the
reporting month.
Landscape and Visual Impact
l No
specific observation was identified in the reporting month.
General Condition
l No
specific observation was identified in the reporting month.
Permit / Licenses
l No
specific observation was identified in the reporting month.