Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

9 January 2019

Observation:

Muddy trail should be sprayed with water and cleaned up regularly. (Portion I)

The item was rectified by the Contractor and inspected on 16 January 2019.

23 January 2019

Reminder:

Vehicle washing facilities should be provided at exit point. (Zone 4)

NA

Noise

9 January 2019

Reminder:

Acoustic fabric should be provided during breaking. (Zone 3&4)

NA

Water Quality

NA

Chemical and Waste Management

NA

Land Contamination

NA

Landscape and Visual Impact

 

NA

 

General Condition

 

NA