Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

8 February 2019

Reminder:

Open stockpiles should be avoided or covered.
(Zone 4)

 

NA

13 February 2019

Reminder:

The exposed area should be sprayed with fine misting of water frequently.
(Zone 4)

NA

Noise

20 February 2019

Reminder:

Noise mitigation measure should be provided during breaking.

(Zone 4)

NA

Water Quality

20 February 2019

Reminder:
Stagnant water inside the U channel should be cleaned regularly.
(Zone 2)

NA

Chemical and Waste Management

NA

Land Contamination

NA

Landscape and Visual Impact

 

NA

 

General Condition

 

NA