10.1.1
24-hour
TSP impact monitoring and construction noise monitoring were carried out in the
reporting month, no Action / Limit Level exceedance was recorded during the
period.
10.1.2
No complaint of air quality was received. Therefore,
no impact 1-hour TSP monitoring was conducted in the reporting month.
10.1.3
Five
environmental site inspections were carried out in the reporting month. Recommendations
on mitigation measures on construction noise was given to the Contractor for
remediating the deficiencies identified during the site inspections.
10.1.4 Five
weekly Landscape and Visual Site audits were carried out on 2, 8, 15, 22 and 24 May
2019 and two of them 8 and 22 May 2019 were carried out by a Registered
Landscape Architect in the reporting month. The weekly Landscape and Visual
Impact reports were counter-signed by IEC as according to the requirement of
EM&A Manual (AEIAR-130/2009).
10.1.5
Referring to the Contractor’s
information, no environmental complaint, notification of summons and successful
prosecution was received in the reporting month.
10.2 Comment and Recommendations
10.2.1
The recommended environmental mitigation
measures, as proposed in the EIA reports and EM&A Manuals shall be
effectively implemented to minimize the potential environmental impacts from
the Project. The EM&A programme would effectively
monitor the environmental impacts generated from the construction activities
and ensure the proper implementation of mitigation measures.
10.2.2
According to the environmental audit
performed in the reporting month, the following recommendations were made:
Air
Quality Impact
l
No specific observation was identified in the
reporting month.
Construction
Noise Impact
l
Noise mitigation measure should be provided during
breaking.
Water Quality Impact
l
No specific observation was identified in the
reporting month.
Chemical and Waste Management
l
No specific observation was identified in the
reporting month.
Land Contamination
l
No specific
observation was identified in the reporting month.
Landscape
and Visual Impact
l
No specific observation was identified in the
reporting month.
General
Condition
l
No specific observation was identified in the
reporting month.
Permit
/ Licenses
l
No specific observation was identified in the
reporting month.