5.1.1
The
effective management of waste arising during the construction phase will be
monitored through the site audit programme. Regular audits and site inspections
should be carried out to ensure that the recommended good site practices and
other mitigation measures are implemented by the Contractor.
5.1.2
The
audit should look at all aspects of on-site waste management practices
including the waste generation, storage, recycling, transport and disposal. The
aims of waste audit are:
l to ensure the waste
arising from the works are handled, stored, collected, transferred and disposed
of in an environmentally acceptable manner;
l verify the
implementation status and evaluate the effectiveness of the mitigation measures;
and
l to encourage the reuse
and recycling of material.
5.2.1
C&D
materials and wastes sorting were carried out on site. Receptacles were
available for C&D wastes and general refuse collection.
5.2.2 The amount of wastes
generated by the site activities in the reporting month is shown in Appendix
I.