6.1.1
Site
inspections were carried out weekly to monitor the implementation of proper
environmental pollution control and mitigation measures for the Project. A
summary of the mitigation measures implementation schedule is provided in Appendix
J.
6.1.2
In
the reporting month, four site inspections were
carried out on 7, 14, 21 and 28
August 2019.
Two of them, held on 7 and 14 August 2019
was the
joint inspections with the IEC, ER, the Contractor and the ET.
6.1.3
No
outstanding issues were reported during the reporting month. Details of
observations recorded during the site inspections are summarized in Appendix
M.
6.1.4
All
the follow-up actions requested by Contractor’s ET and IEC during the site
inspections were undertaken as reported by the Contractor and confirmed in the
following weekly site inspection conducted during the reporting month.