Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

 

NA

Noise

11 September 2019

Reminder 1:
Noise mitigation should be provided during breaking.
(Zone 4)

NA

Water Quality

18 September 2019

Reminder 1:
Water pipe should be replaced as soon as possible.
(Z
one 1)

NA

Chemical and Waste Management

NA

Land Contamination

NA

Landscape and Visual Impact

 

18 September 2019

 

Observation 1:
Hoarding should be erected around the site area.
(Zone 4)

 

Hoarding should be erected ASAP

25 September 2019

Observation 2:
Hoarding should be erected around the site area.
(Zone 4)

Hoarding should be erected ASAP

General Condition

NA

Permit / Licenses

NA