10.1.1 24-hour TSP impact
monitoring and construction noise monitoring were carried out in the reporting
month, no Action / Limit Level exceedance was recorded during the period.
10.1.2 No complaint of air quality was received. Therefore, no impact 1-hour TSP
monitoring was conducted in the reporting month.
10.1.3 Five environmental site
inspections were carried out in the reporting month. Recommendations on
mitigation measures for construction air quality impact and landscape and visual
impact were given to the Contractor for remediating the deficiencies identified
during the site inspections.
10.1.4 Five weekly Landscape and Visual Site audits were carried out on 2, 9, 16, 23 and 30 October 2019 and two of
them 9 and 23 October 2019 were carried out by
a Registered Landscape Architect in the reporting month. The weekly Landscape
and Visual Impact reports were counter-signed by IEC as according to the
requirement of EM&A Manual (AEIAR-130/2009).
10.1.5 Referring to the Contractor’s information, no environmental complaint, notification
of summons and successful prosecution was received in the reporting month.
10.2
Comment and Recommendations
10.2.1 The recommended environmental mitigation measures, as proposed in the EIA
reports and EM&A Manuals shall be effectively implemented to minimize the
potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental
impacts generated from the construction activities and ensure the proper
implementation of mitigation measures.
10.2.2 According to the environmental audit performed in the reporting month,
the following recommendations were made:
Air Quality Impact
l Dust
suppression should be provided.
l Open
stockpiles should be covered.
Construction Noise Impact
l No specific
observation was identified in the reporting month.
Water
Quality Impact
l No specific
observation was identified in the reporting month.
Chemical and Waste Management
l No
specific observation was identified in the reporting month.
Land
Contamination
l No specific observation was identified in the
reporting month.
Landscape and Visual Impact
l Open
stockpiles should be covered.
General Condition
l No
specific observation was identified in the reporting month.
Permit / Licenses