6.1.1
Site inspections were carried out weekly to
monitor the implementation of proper environmental pollution control and
mitigation measures for the Project. A summary of the mitigation measures implementation
schedule is provided in Appendix J.
6.1.2
In the reporting month, four site inspections were
carried out on 6,
14, 20 and 27 November 2019. Two of them, held on 6 and 14 November 2019 was the
joint inspections with the IEC, ER, the Contractor and the ET.
6.1.3
No outstanding issues were reported during the
reporting month. Details of observations recorded during the site inspections
are summarized in Appendix M.
6.1.4
All the follow-up actions requested by
Contractor’s ET and IEC during the site inspections were undertaken as reported
by the Contractor and confirmed in the following weekly site inspection
conducted during the reporting month.