Installation
of sheet pile for drainage pipe and manhole
Excavation
and laying of drainage pipe and manhole
Removal of
temporary decking and temporary road pavement
Construction
of SUS structure
Construction
of District Cooling System
Utility laying
Demolition
of the barging point
9.2.1
Potential environmental impacts arising from
the above construction activities are mainly associated with construction dust,
construction noise, water quality, waste management and landscape and visual
impact.
9.3.1
The tentative schedules for environmental
monitoring in the coming three months are provided in Appendix E.