6.            SITE INSPECTION

 

6.1         Site Inspection

 

6.1.1     Site inspections were carried out weekly to monitor the implementation of proper environmental pollution control and mitigation measures for the Project. A summary of the mitigation measures implementation schedule is provided in Appendix J.

 

6.1.2     In the reporting month, four site inspections were carried out on 2, 8, 15 and 22 January 2020. Two of them, held on 8 and 15 January 2020 was the joint inspections with the IEC, ER, the Contractor and the ET.

 

6.1.3     From 29 January 2020 to 31 January 2020, no site inspection was conducted due to the site was close under the government’s special arrangement to reduce the risk of the spread of the novel coronavirus in the community.

 

6.1.4     No outstanding issues were reported during the reporting month. Details of observations recorded during the site inspections are summarized in Appendix M.

 

6.1.5     All the follow-up actions requested by Contractor’s ET and IEC during the site inspections were undertaken as reported by the Contractor and confirmed in the following weekly site inspection conducted during the reporting month.