Weather and Meteorological Conditions during
Reporting Month |
Appendix
L |
|
Appendix M |
|
Appendix N |
|
|
|
i.
The Civil Engineering and Development
Department HKSAR has appointed MateriaLab Consultants Limited (MCL) to
undertake the Environmental Team services for the Project and implement the EM&A
works.
ii.
This Monthly EM&A report presents the
environmental monitoring and audit works for the period between 1 February and 29
February 2020. As informed by the Contractor, major activities in the reporting
month were:
Excavation and laying of
drainage pipe and manhole;
Construction of SUS structure;
Construction of District
Cooling System;
Utility laying;
Removal of temporary decking
and temporary road pavement;
Construction
of road base and road pavement.
Breaches of the Action and Limit Levels
iii. No Action / Limit Level exceedance was recorded
for 24-hr TSP and construction noise at KTD1a, KTD2b and KER1b in the reporting
month.
Complaint, Notification of Summons and Successful Prosecution
iv. No environmental complaint, notification of
summons and successful prosecution were received in the reporting month.
Reporting Changes
v. There was no reporting change in the
reporting month.
Future Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential environmental
impacts arising from the above construction activities are mainly associated
with construction dust, construction noise, water quality, waste management and
landscape and visual impacts.