5.1.1
The effective management of waste arising
during the construction phase will be monitored through the site audit programme. Regular audits and site inspections should be carried
out to ensure that the recommended good site practices and other mitigation
measures are implemented by the Contractor.
5.1.2
The audit should look at all aspects of on-site
waste management practices including the waste generation, storage, recycling, transport
and disposal. The aims of waste audit are:
l to ensure
the waste arising from the works are handled, stored, collected, transferred
and disposed of in an environmentally acceptable manner;
l verify the
implementation status and evaluate the effectiveness of the mitigation
measures; and
l to encourage
the reuse and recycling of material.
5.2.1
C&D materials and wastes sorting were
carried out on site. Receptacles were available for C&D wastes and general
refuse collection.
5.2.2 The amount
of wastes generated by the site activities in the reporting month is shown in Appendix
D.