7.1.1 Three Action Level exceedance for 24-hr TSP
were recorded. An exceedance was recorded at KTD2c on 14 October 2020 and two exceedance
was recorded at KER1 and KTD2c on 24 October 2020. No Action / Limit Level
exceedance was recorded for 24-hr TSP at KTD1 in the reporting month.
7.1.2 A Limit Level exceedance for construction
noise was recorded. Exceedance was recorded at KTD1 on 21 October 2020. No
Action / Limit Level exceedance was recorded for construction noise at KTD2c
and KER1 in the reporting month.
7.2.1 No environmental complaint, notification of
summons and successful prosecution were received in the reporting month.
7.2.2 Cumulative complaint log, summaries of
complaints, notification of summons and successful prosecutions are presented
in Appendix
G.