7.1.1
One Action Level exceedance for 24-hr TSP were recorded in the reporting
month. An exceedance were recorded at KER1 on 23 December 2020.
7.1.2
One Limit Level exceedance for 24-hr TSP was recorded in the reporting
month. An exceedance was recorded at KTD2c on 29 December 2020.
7.1.3
No Action / Limit Level exceedance was recorded for 24-hr TSP at KTD1 in
the reporting month.
7.1.4
One Limit Level exceedance for construction noise was recorded in the
reporting month. An exceedance was recorded at KER1 on 30 December 2020.
7.1.5
No Action / Limit Level exceedance was recorded for construction noise
at KTD1 and KTD2c in the reporting month.
7.2.1
No environmental complaint, notification of summons and successful
prosecution were received in the reporting month.
7.2.2
Cumulative complaint log, summaries of complaints, notification of
summons and successful prosecutions are presented in Appendix G.