10.1.1
24-hour TSP impact monitoring and construction
noise monitoring were carried out in the reporting month.
10.1.2
Five Action Level exceedance for 24-hr TSP were recorded in the
reporting month. An exceedance were recorded at KER1 on 20 January 2021. Four
exceedance were recorded at KTD2c on 4, 14, 20 and 26 January 2021.
10.1.3
No Action / Limit Level exceedance was recorded for 24-hr TSP at KTD1 in
the reporting month.
10.1.4 No Action /
Limit Level exceedance was recorded for construction noise at KTD1, KTD2c and
KER1 in the reporting month.
10.1.5
No complaint of air
quality was received. Therefore, no impact 1-hour TSP monitoring was conducted
in the reporting month.
10.1.6 Four environmental
site inspections were carried out in the reporting month. No recommendation was
given to the Contractor for remediating the deficiencies identified during the
site inspections.
10.1.7
Four weekly
Landscape and Visual Site audits were carried out 6, 13, 20 and 27 January 2021 and two of
them 13 and 27 January 2021 were
carried out by a Registered Landscape Architect in the reporting month. The
weekly Landscape and Visual Impact reports were counter-signed by IEC as
according to the requirement of EM&A Manual (AEIAR-130/2009).
10.1.8
Referring
to the Contractor’s information, no environmental complaint, notification of
summons and successful prosecution was received in the reporting month.
10.2
Comment and Recommendations
10.2.1 The recommended environmental mitigation measures,
as proposed in the EIA reports and EM&A Manuals shall be effectively
implemented to minimize the potential environmental impacts from the Project. The
EM&A programme would effectively monitor the
environmental impacts generated from the construction activities and ensure the
proper implementation of mitigation measures.
10.2.2 According to the environmental audit performed in
the reporting month, the following recommendations were made:
Air Quality Impact
l No
specific observation was identified in the reporting month.
Construction Noise Impact
l No
specific observation was identified in the reporting month.
Water Quality Impact
l No
specific observation was identified in the reporting month.
Chemical
and Waste Management
l No
specific observation was identified in the reporting month.
Land Contamination
l No
specific observation was identified in the reporting month.
Landscape and Visual Impact
l No
specific observation was identified in the reporting month.
General Condition
l No
specific observation was identified in the reporting month.
Permit / Licenses
l No
specific observation was identified in the reporting month.