8.1.1 The
Contractor has implemented environmental mitigation measures and requirements
as stated in the EIA Reports, the EP and the EM&A Manuals. The implementation
status of the mitigation measures during the reporting month is summarized in Appendix
E. Status of required
submission under the EP during the reporting period is summarized in Table 8.1.