1.1.1 The Kai Tak Development is located in the south-eastern part of
Kowloon Peninsula of the HKSAR, comprising the apron and runway areas of the
former Kai Tak Airport and existing waterfront areas
at To Kwa Wan, Ma Tau Kok, Kowloon Bay, Kwun Tong and Cha Kwo Ling.
1.1.2 Contract No.
KL/2014/03 is the works package to construct an approximately 420m long
supporting underground structure (SUS) underneath Shing
Cheong Road and Cheung Yip Street. The EM&A programme
under this Contract is governed by three EPs (EP-337/2009, EP-339/2009/A and
EP-451/2013) and two EM&A Manuals (AEIAR-130/2009 and AEIAR-174/2013). The
Works to be executed under this Contract and corresponding EPs include but not
be limited to the following main items:
EP-451/2013 – Trunk
Road T2
(i)
Construction of approximately 420m long
supporting underground structure (SUS) including diaphragm walls, barrettes,
piled foundation, top and bottom slabs, end wall and adits
underneath Shing Cheong Road and Cheung Yip Street;
EP-337/2009 – New
Distributor Roads Serving the Planned Kai Tak
Development
(ii)
Widening and re-alignment of Cheung Yip Street
of approximately 330m long and associated footpaths;
(iii)
Demolition, reconstruction and widening of Shing Cheong Road of approximately 410m long and associated
footpaths;
(iv)
Construction of drainage outfall and
modification of existing seawall;
(v)
Construction of ancillary works including
surface drainage, sewerage, water, fire fighting,
street lighting, street furniture, road marking, road signage, utilities and
services, irrigation and landscape works.
EP-339/2009/A
– Decommissioning of the Remaining Parts (Ex-GFS Building, Radar Station and
Hong Kong Aviation Club) of the former Kai Tak
Airport
(vi)
Demolition of RADAR Tower and guard house;
Other works not covered
by any EP
(vii)
Construction of two subways between Phase II of
New Acute Hospital (Site A) and Hong Kong Children’s Hospital (Site C), and
between Phase I of New Acute Hospital (Site B) and Site C;
(viii)
Construction of District Cooling System (DCS)
along Cheung Yip Street and Shing Cheong Road
1.1.3 The location
and boundary of the site is shown in Figure 1.
1.2.1 The project
proponent was the Civil Engineering and Development Department, HKSAR (CEDD). Hyder Meinhardt Joint Venture
(HMJV) was commissioned by CEDD as the Engineer for the Project. Ramboll Hong Kong Limited was commissioned as the
Independent Environmental Checker (IEC). China Road and Bridge Corporation
(Hong Kong) (CRBC) was appointed as the main contractor for the construction
works under the contract KL/2014/03. MateriaLab
Consultants Limited (MCL) was appointed as the Environmental Team (ET) by CEDD
to implement the EM&A programme for the Project.
1.2.2 The
organization structure is shown in Appendix A. The key personnel contact
names and numbers for the Project are summarized in Table 1.1.
1.3.1
The construction of the Project commenced in
February 2016 and is expected to complete in March 2021.
1.3.2
The proposal for Termination of EM&A Programme for construction phase under this Contract was
certified by the ET Leader, verified by the IEC on 15 December 2020, approved
by EPD on 18 March 2021.
1.3.3
No major construction activities undertaken in the reporting month.
1.4.1
A summary of the relevant environmental licenses,
permits and/or notifications on environmental protection for this Contract is
presented in Table 1.2.