6.1.1 Site
inspections were carried out weekly to monitor the implementation of proper
environmental pollution control and mitigation measures for the Project. A summary
of the mitigation measures implementation schedule is provided in Appendix
D.
6.1.2 In the
reporting month, three site inspections were carried out 3, 9, and 17 March
2021.
6.1.3 No
outstanding issues were reported during the reporting month. Details of observations
recorded during the site inspections are summarized in Appendix G.
6.1.4 All the
follow-up actions requested by Contractor’s ET and IEC during the site
inspections were undertaken as reported by the Contractor and confirmed in the
following weekly site inspection conducted during the reporting month.