4.3.1 As per the Trunk Road T2 EM&A Manual,
the landscape and visual mitigation measures during the construction phase
shall be audited by a Registered Landscape Architect, as a member of the Environmental
Team, at least once every two weeks to ensure compliance with the intended aims
of the measures.
4.3.2 According to the Kai Tak Development
EM&A Manual, measures to mitigate landscape and visual impacts during
construction should be checked to ensure compliance with the intended aims of
the measures. The progress of the engineering works shall be regularly reviewed
onsite to identify the earliest practical opportunities for the landscape works
to be undertaken. The ET shall report on the Contractor’s compliance on a
weekly basis.
4.4.1 Site audits were carried out on a weekly
basis to monitor and audit the timely implementation of landscape and visual
mitigation measures within the site boundaries of this project. No non-compliance
was found during the reporting period.
4.4.2 Should non-compliance of the landscape and
visual impact occur, action in accordance with the action plan presented in Appendix B would be performed.