4.            LANDSCAPE AND VISUAL

 

4.3         Audit Requirements

 

4.3.1      As per the Trunk Road T2 EM&A Manual, the landscape and visual mitigation measures during the construction phase shall be audited by a Registered Landscape Architect, as a member of the Environmental Team, at least once every two weeks to ensure compliance with the intended aims of the measures.

 

4.3.2      According to the Kai Tak Development EM&A Manual, measures to mitigate landscape and visual impacts during construction should be checked to ensure compliance with the intended aims of the measures. The progress of the engineering works shall be regularly reviewed onsite to identify the earliest practical opportunities for the landscape works to be undertaken. The ET shall report on the Contractor’s compliance on a weekly basis.

 

4.4         Results and Observations

 

4.4.1      Site audits were carried out on a weekly basis to monitor and audit the timely implementation of landscape and visual mitigation measures within the site boundaries of this project. No non-compliance was found during the reporting period.

 

4.4.2      Should non-compliance of the landscape and visual impact occur, action in accordance with the action plan presented in Appendix B would be performed.