3.            LANDSCAPE AND VISUAL

 

3.1         Results and Observations

 

3.1.1     To monitor and audit the implementation of landscape and visual mitigation measures, 13 weekly Landscape and Visual Site audits were carried out and 7 of them were carried out by a Registered Landscape Architect. The weekly Landscape and Visual Impact reports were counter-signed by IEC as according to the requirement of EM&A Manual (AEIAR-130/2009).

 

3.1.2     Total 5 no. of non-compliance was recorded in the weekly Landscape and Visual Site audits in the reporting period.

 

3.1.3     During the Site audit on 2 June 2016, it is observed that open stockpiles at Portion Q were not fully covered. The item was rectified by the Contractor and inspected on 8 June 2016.

 

3.1.4     During the Site audit on 7 July 2016, it is observed that open stockpiles at Portion C were not fully covered. The item was rectified by the Contractor and inspected on 14 July 2016.

 

3.1.5     During the Site audit on 20 July 2016, it is observed that open stockpiles at Portion C were not fully covered. The item was rectified by the Contractor and inspected on 28 July 2016.

 

3.1.6     During the Site audit on 4 August 2016, it is observed that open stockpiles at Portion F and M were not fully covered. The item was rectified by the Contractor and inspected on 12 August 2016.

 

3.1.7     During the Site audit on 12 August 2016, it is observed that open stockpiles at Portion Q were not fully covered. The item was rectified by the Contractor and inspected on 19 August 2016.