3.1.1 To monitor and audit the implementation of
landscape and visual mitigation measures, 13 weekly Landscape and Visual Site
audits were carried out and 7 of them were carried out by a Registered
Landscape Architect. The weekly Landscape and Visual Impact reports were
counter-signed by IEC as according to the requirement of EM&A Manual (AEIAR-130/2009).
3.1.2 Total 5 no. of non-compliance was recorded
in the weekly Landscape and Visual Site audits in the reporting period.
3.1.3 During the Site audit on 2 June 2016, it is
observed that open stockpiles at Portion Q were not fully covered. The item was
rectified by the Contractor and inspected on 8 June 2016.
3.1.4 During the Site audit on 7 July 2016, it is
observed that open stockpiles at Portion C were not fully covered. The item was
rectified by the Contractor and inspected on 14 July 2016.
3.1.5 During the Site audit on 20 July 2016, it is
observed that open stockpiles at Portion C were not fully covered. The item was
rectified by the Contractor and inspected on 28 July 2016.
3.1.6 During the Site audit on 4 August 2016, it
is observed that open stockpiles at Portion F and M were not fully covered. The
item was rectified by the Contractor and inspected on 12 August 2016.
3.1.7 During the Site audit on 12 August 2016, it
is observed that open stockpiles at Portion Q were not fully covered. The item
was rectified by the Contractor and inspected on 19 August 2016.