5.1.1
Site
inspections were carried out weekly to monitor the implementation of proper
environmental pollution control and mitigation measures for the Project. A summary
of the mitigation measures implementation schedule is provided in Appendix
F.
5.1.2
In
the reporting month, 13 site inspections were carried out. 7 of them were the
joint inspections with the IEC, ER, the Contractor and the ET.
5.1.3
No
outstanding issues were reported during the reporting period.
5.1.4
All
the follow-up actions requested by Contractor’s ET and IEC during the site
inspections were undertaken as reported by the Contractor and confirmed in the
following weekly site inspection conducted during the reporting month.
5.1.5
Details
of observations recorded during the site inspections are presented in Table
5.1.