Executive Summary   I

1.         INTRODUCTION   Error! Bookmark not defined.

2.         Summary of EM&A Requirements and monitoring results   Error! Bookmark not defined.

3.         LANDSCAPE AND VISUAL  Error! Bookmark not defined.

4.         WASTE MANAGEMENT   Error! Bookmark not defined.

5.         SITE INSPECTION   Error! Bookmark not defined.

6.         ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE   Error! Bookmark not defined.

7.         IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES   Error! Bookmark not defined.

8.         Conclusions   Error! Bookmark not defined.

 

 

FIGURES

 

Figure 1                 Project General Layout

Figure 2                 Air and Noise Monitoring Locations

 

 

LIST OF APPENDICES

 

Appendix A

Construction Programme

Appendix B

Project Organization Chart

Appendix C

Action and Limit Levels for Air Quality and Noise

Appendix D

Graphical Presentation of Monitoring Data

Appendix E

Waste Flow Table

Appendix F

Environmental Mitigation Implementation Schedule (EMIS)

 

 

 

 

 


Executive Summary

 

 i.    The Civil Engineering and Development Department HKSAR has appointed MateriaLab Consultants Limited (MCL) to undertake the Environmental Team services for the Project and implement the EM&A works.

 

ii.    This is the third Quarterly EM&A Report presents the environmental monitoring and audit works for the period between 1 September 2016 and 30 November 2016. As informed by the Contractor, major activities in the reporting period included:

 

September 2016

October 2016

November 2016

· Carrying out pre-drilling;

· Construction of guide walls and temporary D-walls;

· Construction of Socketed H piles;

· Temporary utility diversion;

· Excavation and Earth Lateral Support (ELS) construction for Supporting Underground Structure (SUS) and Subway B;

· Demolition of Radar Tower;

· Construction of temporary road diversion of Shing Cheong Road

· Construction of District Cooling System Works; and

· Implementation of Temporary Traffic Arrangement (TTA).

 

· Carrying out pre-drilling;

· Construction of guide walls and temporary D-walls;

· Construction of Socketed H piles;

· Temporary utility diversion;

· Excavation and Earth Lateral Support (ELS) construction for Supporting Underground Structure (SUS) and Subway B;

· Demolition of Radar Tower;

· Construction of District Cooling System Works; and

· Implementation of Temporary Traffic Arrangement (TTA).

 

 

· Carrying out pre-drilling;

· Construction of guide walls and D-walls;

· Construction of Socketed H piles;

· Temporary utility diversion;

· Excavation and Earth Lateral Support (ELS) construction for Supporting Underground Structure (SUS);

· Construction of Subway B;

· Demolition of Radar Tower;

· Construction of District Cooling System Works; and

· Implementation of Temporary Traffic Arrangement (TTA).

 

 

 

Breaches of the Action and Limit Levels

 

 iii.   No Action and Limit Level exceedance for 24-hr TSP and noise was recorded in the reporting period at all monitoring stations.

 

Complaint, Notification of Summons and Successful Prosecution

 

iv.   No environmental complaint and no notification of summons and successful prosecution were received in the reporting period.