TABLE OF CONTENTS

 

Executive Summary   1

1.         INTRODUCTION   2

2.         Summary of EM&A Requirements and monitoring results   5

3.         LANDSCAPE AND VISUAL  7

4.         WASTE MANAGEMENT   8

5.         SITE INSPECTION   9

6.         ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE   12

7.         IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES   14

8.         Conclusions   15

 

 

FIGURES

 

Figure 1                 Project General Layout

Figure 2                 Air and Noise Monitoring Locations

 

 

LIST OF APPENDICES

 

Appendix A

Construction Programme

Appendix B

Project Organization Chart

Appendix C

Action and Limit Levels for Air Quality and Noise

Appendix D

Graphical Presentation of Monitoring Data

Appendix E

Waste Flow Table

Appendix F

Environmental Mitigation Implementation Schedule (EMIS)

 

 

 

 

 


Executive Summary

 

   i.   The Civil Engineering and Development Department HKSAR has appointed MateriaLab Consultants Limited (MCL) to undertake the Environmental Team services for the Project and implement the EM&A works.

 

  ii.   This is the fifth Quarterly EM&A Report presents the environmental monitoring and audit works for the period between 1 March 2017 and 31 May 2017. As informed by the Contractor, major activities in the reporting period included:

 

March 2017

April 2017

May 2017

· Temporary utility diversion;

· Implementation of Temporary Traffic Arragement (TTA);

· Construction of Tunnel structure;

· Construction of Socket H-piles;

· Construction of drainage works;

· Construction of guide walls and D-walls; and

· Construction of District Cooling System Works.

 

· Temporary utility diversion;

· Implementation of Temporary Traffic Arragement (TTA);

· Construction of Tunnel structure;

· Construction of Socket H-piles;

· Construction of drainage works;

· Construction of guide walls and D-walls;

· Construction of District Cooling System Works; and

· Installation of temporary cut-off wall.

 

· Temporary utility diversion;

· Implementation of Temporary Traffic Arragement (TTA);

· Construction of Tunnel structure;

· Construction of Socket H-piles;

· Construction of drainage works;

· Construction of guide walls and D-walls;

· Construction of District Cooling System Works; and

· Installation of temporary cut-off wall.

 

 

Breaches of the Action and Limit Levels

 

 iii.   No Action and Limit Level exceedance for 24-hr TSP and noise was recorded in the reporting period at all monitoring stations.

 

Complaint, Notification of Summons and Successful Prosecution

 

iv.     A complaint received on 2 May 2017 was referred from CEDD and summarized as below:

The notification of complaint was received by ET on 4 May 2017.

 

 v.   No notification of summons and successful prosecution were received in the reporting period.