7.            IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES

 

7.1         Implementation Status

 

7.1.1     The Contractor has implemented environmental mitigation measures and requirements as stated in the EIA Reports, the EP and the EM&A Manuals. The implementation status of the mitigation measures during the reporting period is summarized in Appendix F.