1.1.1
The Kai Tak
Development is located in the south-eastern part of Kowloon Peninsula of the
HKSAR, comprising the apron and runway areas of the former Kai Tak Airport and existing waterfront areas at To Kwa Wan, Ma
Tau Kok, Kowloon Bay, Kwun
Tong and Cha Kwo Ling.
1.1.2
Contract No. KL/2014/03 is the works package to
construct an approximately 420m long supporting underground structure (SUS)
underneath Shing Cheong Road and Cheung Yip Street. The EM&A programme
under this Contract is governed by three EPs (EP-337/2009, EP-339/2009/A and
EP-451/2013) and two EM&A Manuals (AEIAR-130/2009 and AEIAR-174/2013). The
Works to be executed under this Contract and corresponding EPs include but not
be limited to the following main items:
EP-451/2013 – Trunk Road T2
(i)
Construction of approximately 420m long
supporting underground structure (SUS) including diaphragm walls, barrettes,
piled foundation, top and bottom slabs, end wall and adits
underneath Shing Cheong Road and Cheung Yip Street;
EP-337/2009 – New Distributor Roads Serving the
Planned Kai Tak Development
(ii)
Widening and re-alignment of Cheung Yip Street
of approximately 330m long and associated footpaths;
(iii)
Demolition, reconstruction and widening of
Shing Cheong Road of approximately 410m long and associated footpaths;
(iv)
Construction of drainage outfall and
modification of existing seawall;
(v)
Construction of ancillary works including
surface drainage, sewerage, water, fire fighting,
street lighting, street furniture, road marking, road signage, utilities and
services, irrigation and landscape works.
EP-339/2009/A –
Decommissioning of the Remaining Parts (Ex-GFS Building, Radar Station and Hong
Kong Aviation Club) of the former Kai Tak Airport
(vi)
Demolition of RADAR Tower and guard house;
Other works not covered by any EP
(vii)
Construction of two subways between Phase II of
New Acute Hospital (Site A) and Hong Kong Children’s Hospital (Site C), and
between Phase I of New Acute Hospital (Site B) and Site C;
(viii)
Construction of District Cooling System (DCS)
along Cheung Yip Street and Shing Cheong Road
1.1.3
The location and boundary of the site is shown
in Figure 1.
1.2.1
The project proponent was the Civil Engineering
and Development Department, HKSAR (CEDD). Hyder Meinhardt Joint Venture (HMJV) was commissioned by CEDD as
the Engineer for the Project. Ramboll Hong Kong
Limited was commissioned as the Independent Environmental Checker (IEC). China
Road and Bridge Corporation (Hong Kong) (CRBC) was appointed as the main
contractor for the construction works under the contract KL/2014/03. MateriaLab Consultants Limited (MCL) was appointed as the
Environmental Team (ET) by CEDD to implement the EM&A programme for the
Project.
1.2.2
The organization structure is shown in Appendix B. The key personnel contact
names and numbers for the Project are summarized in Table 1.1.
Table 1.1 Contact Information of Key Personnel
Party |
Position |
Name |
Telephone |
Fax |
Project
Proponent (CEDD) |
Co-ordinator |
Ms.
Amy Chu |
3106 3172 |
2369 4980 |
Engineer’s
Representative (HMJV) |
Chief
Resident Engineer |
Mr.
W. K., Chris Wong |
3742 3803 |
3742 3899 |
IEC
(Ramboll Hong Kong Limited) |
Independent
Environmental Checker |
Mr.
F. C. Tsang |
3465 2851 |
3465 2899 |
Main
Contractor (CRBC) |
Site
Agent |
Mr.
Chan See Wai, Arnold |
9380 4110 |
2283 1689 |
Environmental
Officer |
Mr.
Calvin So |
9724 6254 |
2283 1689 |
|
ET
(MCL) |
Environmental
Team Leader |
Mr.
Colin Yung |
3565 4114 |
3565 4160 |
1.3.1
The construction of the Project commenced in
February 2016 and is expected to complete in 2020. The construction programme
is shown in Appendix A. A summary of the major construction
activities undertaken in the reporting period were:
March 2018 |
April 2018 |
May 2018 |
· Excavation and laying of drainage pipe and
manhole; · Seawall modification works; · Construction of tunnel box structure; · D-wall construction works; · Pumping test; and · Excavation and ELS construction. |
· Excavation and laying of drainage pipe and
manhole; · Seawall modification works; · Construction of tunnel box structure; · D-wall construction works; · Pumping test; · Excavation and ELS construction. |
· Excavation and laying of drainage pipe and
manhole; · Seawall modification works; · Construction of tunnel box structure; · D-wall construction works; · Pumping test; · Excavation and ELS construction. |