Table 5.1 Observations and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
|
Air Quality |
1 March 2018 |
Mud and silt deposits were found at the entrance
of Portion I. Contractor should clean the ground regularly. |
The item was rectified by the
Contractor and inspected on 8 March 2018. |
|
Contractor
was reminded to apply dust suppression measures such as water spraying to
open stockpile. (Portion H) |
The item was rectified by the
Contractor and inspected on 8 March 2018. |
|||
8 March 2018 |
Dark smoke
were emitted from plant. Contractor should maintain the machine/plant
regularly to prevent dark smoke emission. |
The item was rectified by the
Contractor and inspected on 15 March 2018. |
||
14 March 2018 |
Excavated
earth material were brought to road by unfully
washed wheels (Portion K). Contractor should clean the road ASAP. |
The item was rectified by the
Contractor and inspected on 21 March 2018. |
||
4 April 2018 |
Contractor was reminded to provide sufficient
watering on stockpile to suppress dust (Radar Tower). |
The item was rectified by the
Contractor and inspected on 12 April 2018. |
||
18 April 2018 |
Contractor was reminded to replace the
NRMM label of mobile crane shall be replaced with proper label color (Zone 3). |
The item was rectified by the
Contractor and inspected on 26 April 2018. |
||
26 April 2018 |
Contractor was reminded that NRMM
label on mobile crane shall be replaced with proper label color
(Zone 2). |
The item was rectified by the
Contractor and inspected on 3 May 2018. |
||
3 May 2018 |
Dark smoke was emitted from machine plant (Zone
2). Contractor should maintain plant/equipment regularly to prevent dark
smoke emission. |
The item was rectified by the
Contractor and inspected on 10 May 2018. |
||
10 May 2018 |
Contractor was reminded that stockpile
should be covered properly with impermeable sheeting (Zone 1) |
The item was rectified by the
Contractor and inspected on 16 May 2018. |
||
31 May 2018 |
Contractor was reminded to remove the
stockpile to avoid dust (Zone 2) |
The item was rectified by the
Contractor and inspected on 7 June 2018. |
||
Noise |
NA |
|||
Water Quality |
8 March 2018 |
Contractor was reminded to take
precaution measures at any time of year when rainstorm is likely. |
The item was rectified by the
Contractor and inspected on 15 March 2018. |
|
21 March 2018 |
Stagnant water were accumulating in
Portion K. Contractor should complete the pumping system ASAP. |
The item was rectified by the
Contractor and inspected on 26 March 2018. |
||
26 March 2018 |
Sediments and stagnant water were
found in the u-channel (Zone 2). Sediments and stagnant water shall be
removed regularly. |
The item was rectified by the
Contractor and inspected on 4 April 2018. |
||
12 April 2018 |
Slurry was observed accumulating in
the U-Channel (Zone 2). Contractor should clean the U-Channel regularly to
prevent accumulation of slurry. |
The item was rectified by the
Contractor and inspected on 18 April 2018. |
||
18 April 2018 |
Contractor was reminded to clean the
sediments inside the sedimentation tank regularly (Zone 1). |
The item was rectified by the
Contractor and inspected on 26 April 2018. |
||
3 May 2018 |
Contractor was reminded that stagnant
water shall be removed (Zone 3). |
The item was rectified by the
Contractor and inspected on 10 May 2018. |
||
16 May 2018 |
Contractor was reminded to provide
concrete bunding at site exits to prevent leakage
of muddy water to public areas (Zone 3 and 4). |
The item was rectified by the
Contractor and inspected on 24 May 2018. (Zone 3) |
||
24 May 2018 |
Contractor was reminded to provide
concrete bunding at site exits to prevent leakage
of muddy water to public areas (Zone 4). |
The item was rectified by the
Contractor and inspected on 31 May 2018. |
||
31 May 2018 |
The mud in wheel washing facility
should be removed (Portion I). |
The item was rectified by the
Contractor and inspected on 7 June 2018. |
||
Chemical and Waste Management |
1 March 2018 |
Oil
Stain was found on ground at Zone 2. Contractor should clean the oil stain
and dispose the waste as chemical waste. |
The item was rectified by the
Contractor and inspected on 8 March 2018. |
|
26 March 2018 |
Chemical
container shall be stored and labelled properly (Zone 1). Drip tray and
labels shall be provided |
The item was rectified by the Contractor
and inspected on 4 April 2018. |
||
26 March 2018 |
Chemical
container shall be orderly and carefully stored (Zone 1). Drip tray and
labels shall be provided |
The item was rectified by the
Contractor and inspected on 4 April 2018. |
||
16 May 2018 |
Chemical containers shall be placed on
drip tray (Zone 2 and 3). Drip tray shall be provided. |
The item was rectified by the
Contractor and inspected on 24 May 2018. |
||
Land Contamination |
1 March 2018 |
Oil stain
was found on ground at Zone 2. Contractor should clean the oil stain and
dispose the waste as chemical waste. |
The
item was rectified by the Contractor and inspected on 8 March 2018. |
|
Landscape and Visual Impact |
26 March 2018 |
Construction material shall be orderly and
carefully stored (Zone 1). |
The item was rectified by the
Contractor and inspected on 4 April 2018. |
|
10 May 2018 |
Contractor was reminded that stockpile
should be covered properly with impermeable sheeting (Zone 1) |
The item was rectified by the
Contractor and inspected on 16 May 2018. |
||
General |
NA |
|||