3.1.1 To monitor and audit the implementation of
landscape and visual mitigation measures, 13 weekly Landscape and Visual Site
audits were carried out and 6 of them were carried out by a Registered
Landscape Architect. The weekly Landscape and Visual Impact reports were counter-signed
by IEC as according to the requirement of EM&A Manual (AEIAR-130/2009).
3.1.2
During the site inspection on 26 September 2018, contractor was reminded
to check and properly cover all stockpiling after typhoon.
3.1.3
During the site audit on 24 October 2018, contractor was reminded that
the backfilling material in Zone 1 should be properly covered.
3.1.4 No non-compliance was recorded in the weekly
Landscape and Visual Site audits in the reporting period.
3.1.5 Observations and recommendations during site
audits are summarized in Table 5.1.