3.            LANDSCAPE AND VISUAL

 

3.1         Results and Observations

 

3.1.1     To monitor and audit the implementation of landscape and visual mitigation measures, 13 weekly Landscape and Visual Site audits were carried out and 6 of them were carried out by a Registered Landscape Architect. The weekly Landscape and Visual Impact reports were counter-signed by IEC as according to the requirement of EM&A Manual (AEIAR-130/2009).

 

3.1.2     During the site inspection on 26 September 2018, contractor was reminded to check and properly cover all stockpiling after typhoon.

 

3.1.3     During the site audit on 24 October 2018, contractor was reminded that the backfilling material in Zone 1 should be properly covered.

 

3.1.4     No non-compliance was recorded in the weekly Landscape and Visual Site audits in the reporting period.

 

3.1.5     Observations and recommendations during site audits are summarized in Table 5.1.