TABLE OF CONTENTS
2. SUMMARY
OF EM&A REQUIREMENTS AND MONITORING RESULTS
6. ENVIRONMENTAL
COMPLAINT AND NON-COMPLIANCE
7. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project General Layout
Figure
2 Air and Noise Monitoring
Locations
LIST OF APPENDICES
|
|
|
|
i. The Civil
Engineering and Development Department HKSAR has appointed Fugro Technical
Services Limited (FTS) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii. This is the
twelfth Quarterly EM&A Report presents the environmental monitoring and
audit works for the period between 1 December 2018 and 28 February 2019. As
informed by the Contractor, major activities in the reporting period included:
December
2018 |
January
2019 |
February
2019 |
·
Excavation and laying of drainage pipe and manhole; ·
Excavation and ELS construction. ·
Construction of SUS structure; and ·
Construction of District Cooling System. |
·
Excavation and laying of drainage pipe and manhole; ·
Excavation and ELS construction. ·
Construction of SUS structure; and ·
Construction of District Cooling System. |
·
Excavation and laying of drainage pipe and manhole; ·
Excavation and ELS construction. ·
Construction of SUS structure; and ·
Construction of District Cooling System. |
Breaches of the Action and Limit Levels
iii. No Action and Limit Level exceedance for
24-hr TSP and noise was recorded in the reporting period at all monitoring
stations.
Complaint, Notification of Summons and Successful Prosecution
iv. No environmental complaint and no
notification of summons and successful prosecution were received in the
reporting period.