8.1.1 No Action
and Limit Level exceedance for 24-hr TSP and noise was recorded in the
reporting period at all monitoring stations.
8.1.2 No complaint of air quality was received. Therefore, no impact 1-hour TSP
monitoring was conducted in the reporting period.
8.1.3 13 weekly environmental
site inspections were carried out in the reporting period. Recommendations on
mitigation measures on air quality, noise quality, chemical and waste
management were given to the Contractor for remediating
the deficiencies identified during the site inspections.
8.1.4 13 weekly Landscape and Visual Site audits were
carried out on in the reporting period and 7 of them were carried out by a
Registered Landscape Architect in the reporting period. The weekly Landscape
and Visual Impact reports were counter-signed by IEC as according to the
requirement of EM&A Manual (AEIAR-130/2009). No non-compliance was recorded
in the weekly Landscape and Visual Site audits in the reporting period.
8.1.5
Referring
to the Contractor’s information, no notification of summons and successful
prosecution was received in the reporting period.
8.2.1 The recommended environmental mitigation measures,
as proposed in the EIA reports and EM&A Manuals shall be effectively
implemented to minimize the potential environmental impacts from the Project. The
EM&A programme would effectively monitor the environmental impacts generated
from the construction activities and ensure the proper implementation of
mitigation measures.
8.2.2 According to the environmental audit performed in
the reporting period, the following recommendations were made:
Air Quality Impact
l Open
stockpiles should be covered regularly.
Construction Noise Impact
l Noise
mitigation should be provided during breaking.
Water Quality Impact
l No
specific observation was identified in the reporting period.
Chemical
and Waste Management
l All
waste generated at the site should be cleared and collected frequently.
Land Contamination
l No
specific observation was identified in the reporting period.
Landscape and Visual Impact
l No
specific observation was identified in the reporting period.
General Condition
l No
specific observation was identified in the reporting period.
Permit / Licenses
l The
NRMM label should be replaced to its proper color.