8.            Conclusions

 

8.1.1     No Action and Limit Level exceedance for 24-hr TSP and noise was recorded in the reporting period at all monitoring stations.

 

8.1.2     No complaint of air quality was received. Therefore, no impact 1-hour TSP monitoring was conducted in the reporting period.

 

8.1.3     13 weekly environmental site inspections were carried out in the reporting period. Recommendations on mitigation measures on air quality, chemical and waste management, landscape and visual impact and permit / licenses were given to the Contractor for remediating the deficiencies identified during the site inspections.

 

8.1.4     13 weekly Landscape and Visual Site audits were carried out on in the reporting period and 7 of them were carried out by a Registered Landscape Architect in the reporting period. The weekly Landscape and Visual Impact reports were counter-signed by IEC as according to the requirement of EM&A Manual (AEIAR-130/2009). No non-compliance was recorded in the weekly Landscape and Visual Site audits in the reporting period.

 

8.1.5     Referring to the Contractor’s information, no notification of summons and successful prosecution was received in the reporting period.

 

8.2         Comment and Recommendations

 

8.2.1     The recommended environmental mitigation measures, as proposed in the EIA reports and EM&A Manuals shall be effectively implemented to minimize the potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental impacts generated from the construction activities and ensure the proper implementation of mitigation measures.

 

8.2.2     According to the environmental audit performed in the reporting period, the following recommendations were made:

 

Air Quality Impact

l   All dusty materials should be fully covered.

 

Construction Noise Impact

l   No specific observation was identified in the reporting period.

 

Water Quality Impact

l   No specific observation was identified in the reporting period.

 

Chemical and Waste Management

l   All chemical waste should be stored properly.

l   All waste generated at the site should be cleared.

Land Contamination

l   No specific observation was identified in the reporting period.

 

Landscape and Visual Impact

l   Construction materials should be tidy up.

 

General Condition

l   No specific observation was identified in the reporting period.

 

Permit / Licenses

l   NRMM labels should be provided to replace the substandard label.